Volkswagen and Noodoe have celebrated the launch of VW's high-speed EV charging network in Taiwan. VW unveiled the first of the upcoming 360kW DC fast charging stations, powered by Noodoe EV OS.
By James Foster
May 31, 2024
Read time: 1 min
The first of Flo's Ultra DC fast chargers has officially came off the assembly line at its facility in Auburn Hills, Mich. The Flo Ultra charger can charge most EVs to 80% in just 15 minutes using a dual port 320kW power configuration. It is designed to comply with the National Electric Vehicle Infrastructure Program's (NEVI) standards and the Buy America Act, and Flo says the new chargers support federal initiatives to build a cohesive, nationwide network of EV charging stations to mitigate range anxiety and boost public confidence in EVs. #EVcharging https://www.evcandi.com/news/flo-assembles-first-flo-ultra-charging-stations-michigan
The new charging network offers high-speed charging with an industry-leading 98% uptime, ensuring unmatched reliability.
The cloud-based system controls and operates the infrastructure, automating station management, payment processing, and station repair and recovery. This streamlines the charging experience for EV drivers, making electric mobility convenient and accessible.
Launching this first charging station marks a significant milestone for Volkswagen's charging network and for the country's transition towards cleaner transportation solutions.
As Volkswagen leads the way with its Noodoe-powered charging network, the stage is set for a sustainable future where electric mobility plays a central role in reducing emissions and fostering environmental stewardship.