Skip to main content

Schneider opens major zero emission EV charging depot in California

Schneider National has announced the completion of an electric charging depot at its South El Monte Intermodal Operations Centre in Southern California. 
By James Foster June 13, 2023 Read time: 2 mins
Schneider leads the way in building infrastructure to support the operations of its nearly 100 Class 8 battery electric trucks. Photo: Business Wire
Schneider leads the way in building infrastructure to support the operations of its nearly 100 Class 8 battery electric trucks. Photo: Business Wire

The depot will power its battery electric truck (BET) fleet, which will include nearly 100 Freightliner eCascadias by year’s end, making it one of North America’s largest zero emission fleets.

The charging site is over half the size of a football field, featuring 16 350 kW dual-corded dispensers, allowing the carrier to charge 32 trucks simultaneously. The eCascadias will be able to achieve an 80% charge within 90 minutes.

“Schneider decided to lead the way by building our own depot in South El Monte," said Schneider President and CEO Mark Rourke. “It was important to develop onsite charging because it is the most efficient solution to power our growing electric fleet. With the infrastructure deficiency, we found that we needed to collaborate with a wide array of experts to see our vision come to fruition.”

Schneider’s facility is centrally located within the metro Los Angeles area and adjacent to major highways with a high density of customers within a 50-mile radius. Already this year, the company has begun hauling deliveries for Frito-Lay North America and Goodyear using the new eCascadia fleet, supporting each companies’ supply chain sustainability goals. The eCascadias have a range of approximately 220 miles.

The South El Monte site was funded through the Joint Electric Truck Scaling Initiative (JETSI), a project funded by state and local agencies to increase the number of zero emission heavy-duty trucks on the roads. Schneider collaborated with similar sustainably minded companies, including clean transportation engineering and construction company Black & Veatch, to build the site and create an operationally efficient layout.

“This 4,900-square-foot state-of-the-art electric truck charging hub is a monumental testament to innovation and collaboration,” said Dave Hallowell, Black & Veatch president of the connectivity, commercial, and industrial sector. “The collaboration between Schneider and all the project partners will result in new employment opportunities for the area, along with a significant reduction in pollution.”

boombox1
boombox2